top of page
IMG_0539_edited_edited_edited.jpg

TULL HEAT TERMS AND CONDITIONS

The following Terms and Conditions apply to all work carried out by Tull Heat. Its highly recommended that the following points are read, understood and any questions asked before any work is undertaken.

  1. Whilst all reasonable care will be taken during the execution of the works, no responsibility can be accepted for any faults or failures that may occur to existing pipework, fittings, equipment, etc. due to disturbance caused by the proposed works. 


  2. The attached quote is based on a non-intrusive survey of the property and, as such, it is assumed that any existing systems that I connect to are in good condition and in working order. Should I find, during the course of the works, any faults with the existing systems I reserve the right to make a charge for correcting. Also, should the client fail to mention any relevant facts relating to the existing installation we reserve the right to make a charge for correcting. 


  3. If, during the execution of the proposed works it is necessary to gain access into floors below fitted carpets, these will be lifted by us and laid back on completion. No re-stretching or fixing has been allowed for unless specified. For floors covered with thermoplastic tiles, vinyl sheet covering, cork tiles or laminate flooring, no allowance has been made for re- instatement unless specified. 


  4. During the execution of the proposed works, it may be necessary to isolate various water, gas & electrical services. This will be advised in good time and the period of isolation will be as short as possible. 


  5. Whilst all holes formed during the execution of the proposed works will be made good on completion, no allowance has been made for re-instatement of decorations. We do not guarantee to match existing brickwork where boiler flue terminals have been removed although every effort will be made to ensure suitable finish is left.


  6. No allowance has been made for casing in of pipework or painting/decorating of the new works, unless specified. 


  7. It has been assumed that unrestricted access to all relevant parts of the property will be afforded to me during the course of the works. Any delays caused by restricted access not notified at the time of survey may be subject to an extra charge and/or delay in completion. 


  8. Where other trades are involved in the works and these trades are not under my control any delays that may be caused to our progress by these trades may be subject to an extra charge and/or delay in completion. 


  9. Ownership of any materials supplied, whether fixed or unfixed, shall not pass to the Client until payment in full has been received for said materials. We reserve the right to take whatever legal action may be necessary to secure payment for the works carried out and materials supplied either fixed or unfixed. 


  10. No allowance has been made for out-of-hours working unless specified or to suit our own requirements. 


  11. All dates or times given for the start of or duration of the works are given in good faith based on the information gained during the survey and our current workload commitments. These times may be varied, however, due to unforeseen circumstances i.e. emergency call-outs, breakdowns, etc. or to circumstances beyond our control. No liability will be accepted if it is not possible to meet clients timescales. 


  12. The works described in the estimate will be guaranteed for a period of twelve months from date of completion against faulty design and workmanship. The materials supplied will be subject to the suppliers/manufacturers guarantees and/or warranties. The Client’s Statutory Right in law are not effected by this guarantee. This guarantee does not extend to existing, installed equipment, pipework or fittings.

  13. Whilst certain items may be specified by name or model, we reserve the option to supply goods of a different manufacture providing they shall be suitable for the purpose intended.

  14. Any items or materials supplied by the Client or others for our fixing will be unpacked and inspected. Any faults found will be pointed out to the Client whose responsibility it will be to obtain replacement items. Any delays caused by faulty or damaged items may be chargeable, may result in us withdrawing from site and may affect the completion date of the works.

  15. Any additional works that the Client requires to be carried out whilst the specified works are being executed will be charged at extra cost. An indication of such cost will be given and the Client’s agreement will be obtained before the additional works proceed.

  16. The total balance owed for any work carried out with be due immediately on completion on the work and it is a condition of acceptance that this be adhered to. I reserve the right to charge interest at the rate of 5% above Lloyds TSB Bank plc’s current base rate per month on overdue accounts and any cost incurred chasing late payments will be charged in addition of money owed.

  17. The price specified in this quote does not include for the removal of any dangerous waste materials such as asbestos found when carrying out the works. This will be subject to an extra charge.

  18. During work involving gas appliances, the existing gas supply will be subject to a gas soundness test (tightness test) to check for compliance with Gas Safety Regulations. Any faults found will be advised to the Client and any rectification works required may be subject to additional charges.

  19. Should the works include a powerflush of the existing heating system, it must be pointed out that, whilst this treatment is generally harmless, depending on the condition of the existing components the process may find weaknesses in the system. Should any such problems be encountered then any rectification works required may be charged at extra cost. All systems, regardless of age, should be able to cope with the treatment.

  20. Should the works include a new combination heating boiler unit connected to an existing heating system, the Client should be aware that the higher pressures used by this type of boiler may find weaknesses in the existing system. Any repairs required in this respect are not included in this estimate. All systems, regardless of age, should be able to cope with the additional pressure.

  21. It is the responsibility of the Client to ensure that all children and pets are kept away from the areas in which we are working.

  22. If the proposed works are being carried out in a leasehold property it is the sole responsibility of the Client to ensure that all necessary permissions have been obtained in writing from the landlords/managing agents. We accept no responsibility whatever for any works carried out without the necessary permissions. We can furnish details of the proposed works if so required at possible additional cost.

24. Acceptance of any quote, estimate or verbal agreement to proceed with any works confirms acceptance of these conditions.

bottom of page